By Mike Stoler, The Builder’s 2nd Opinion. A builder with 30 years in custom homes and remodeling.
Most people who remodel stay in the house while the work goes on. It saves rent, keeps the kids in their routine, and lets you keep an eye on the job. It also means strangers in your home every weekday, dust on everything, and a kitchen or bathroom you can’t use for weeks.
The homeowners who come through it best are not the ones with the most patience. They’re the ones who settled the house rules with their contractor before the first wall came down. Here’s what to settle, and what to expect.
What should you agree on with your contractor before work starts?
Put these in writing, in the contract or a one-page addendum. A friendly verbal “sure, no problem” is forgotten by week three.
- Work hours. What time can the crew arrive, and when do they stop? Are Saturdays included? Many towns have noise ordinances, but your own rules can be stricter.
- Access and keys. Who gets a key or lockbox code? Will someone be in the house when you’re not home? What happens to the code when the job ends?
- Which bathroom the crew uses. If they’ll use one of yours, say which one, and who cleans it. Many contractors bring a portable toilet on bigger jobs; ask.
- Parking and the dumpster. Where trucks park, where the dumpster sits, and who repairs the lawn or driveway if it’s damaged.
- Off-limits areas. Rooms the crew should never enter, and what they may use: outlets, the hose, the garage, your trash cans.
- Pets and kids. Who keeps the dog away from an open door? Where do the kids play safely while tools and nails are out?
- Daily cleanup. “Broom clean” every day is a fair request. Ask where tools and materials are stored overnight.
- Smoking, music and language. It sounds small. It isn’t, when it’s happening in your house 8 hours a day.
How do you live with the dust, noise and a missing kitchen?
Dust gets everywhere, so plan for it. Ask your contractor how they’ll contain it. A good one hangs plastic dust walls with zipper doors, covers floor paths with protective paper, and seals the return-air vents in the work area. Turn off forced-air heat or AC in that zone if you can, or the system will spread fine drywall dust through the whole house. Change your furnace filter when the job ends.
Pack up more than you think. Move furniture, pictures and anything breakable out of the work area and the rooms next to it. Hammering shakes walls, and frames fall off the other side.
Set up a temporary kitchen if the kitchen is being remodeled. A table in the dining room or garage with the refrigerator, a microwave, a toaster oven or air fryer, a coffee maker, and paper plates covers most meals. The laundry sink or a bathroom sink becomes your dishwasher. Ask how many weeks you’ll be without a working kitchen, then add a couple.
If it’s your only bathroom, ask the contractor to schedule the work so you’re never without a toilet overnight. Get that commitment in writing. A gym membership can cover showers for a week or two.
Expect noise from the first day. Demolition is the loudest and dustiest part, usually the first week. If you work from home, find another spot for those days.
How do you talk to the crew without slowing the job or paying extra?
Living in the house means you see everything, every day. That’s an advantage, if you use it the right way.
- Have one point of contact. Know who runs the job, usually the owner or a lead carpenter. Bring questions and concerns to that person, not to whichever worker is in the room. A tile setter can’t change the scope, and telling him to can cost you.
- Set a weekly check-in. Ten minutes, same day each week: what got done, what’s next, what decisions they need from you. It keeps small worries from building up.
- Be careful with “while you’re here.” Asking the crew to fix a door or add an outlet sounds small. Every one of those is a change order, and change orders are where budgets go over. Get the price in writing before the work is done, every time.
- Make decisions on time. If you haven’t picked the faucet or tile by the date they need it, the crew moves to another job and yours sits. Living there, you’ll feel every day of that delay.
- Write things down. A short text or email after a conversation, “Just to confirm, you’re moving the vanity light 6 inches left,” saves arguments later.
And be decent to the people in your house. Coffee in the morning costs little and buys a lot of goodwill on a long job.
When should you move out instead?
Staying put isn’t always the smart choice. Consider moving out, even for a few weeks, if:
- The project touches most of the house at once, like a whole-floor gut or a large addition tied into the existing house.
- Old paint or materials will be disturbed. In homes built before 1978, assume lead paint until it’s tested, and ask how the contractor will handle it. Small children and pregnant women should not be in the house during that work.
- Someone in the home has asthma or breathing problems, or is recovering from surgery.
- You’ll be without your only bathroom or without heat for more than a day or two.
Ask your contractor for an honest estimate of the weeks each room will be unusable. Then compare a short-term rental against the cost of living through it.
Frequently asked questions
Can I stay in my house during a kitchen remodel? Yes, most people do. Expect 6 to 12 weeks without a working kitchen on a typical full remodel, so set up a temporary kitchen elsewhere in the house.
Should I be home while the contractor is working? You don’t have to be. Agree on keys or a lockbox code and off-limits rooms in writing, and lock up valuables and medications.
How do I keep remodeling dust out of the rest of the house? Ask for plastic dust walls with zipper doors, sealed air vents in the work area, and floor protection along the crew’s path. Change your furnace filter when the job ends.
What if the crew does something I didn’t ask for? Stop and talk to the person running the job, not the worker. Anything that changes the scope or price should be a written change order before the work is done.