What’s Included in a Contractor’s Price (and What Usually Isn’t)

Two remodeling bids land on your kitchen table. One is $48,000. The other is $61,000. The natural reaction is to wonder why the second contractor is charging so much more.

Often the better question is: what is each of them actually pricing?

A contractor’s number is only as meaningful as the list of work behind it. Two bids for “a bathroom remodel” can describe very different projects, and the gap between them is frequently made up of items one contractor included and the other left out, assumed you’d handle yourself, or planned to charge for later.

Here’s how to read a price so you know what you’re comparing.

Start with the scope, not the number

Before looking at the total, look for a written scope of work: a description of what will be done, room by room or trade by trade. A one-line bid (“Remodel hall bath per discussion — $28,500”) tells you almost nothing. A good scope tells you what’s coming out, what’s going in, who supplies it, and where the work stops.

If a bid doesn’t include a scope, ask for one. If a contractor is unwilling to put the scope in writing, that tells you something too.

The items that most often fall through the cracks

These are the places where prices most commonly differ. None of them are unusual. They’re just easy to assume.

Permits and inspections. Who applies for the permit, who pays the fees, and who meets the inspector? On many projects this is the contractor’s job, but don’t assume it. Fees vary widely by municipality.

Design and drawings. Some prices include plans, engineering or a designer’s time. Others assume you’ll arrive with drawings in hand.

Demolition and disposal. Taking out the old kitchen is work. So is hauling it away. Is the dumpster included? Who pays if it fills up and needs to be swapped?

Protection and cleanup. Floor protection, dust barriers, daily cleanup and a final clean at the end all take time and materials. Ask what “clean” means at the end of the job: broom-swept, or ready to move back in?

Patching, painting and finishing. This is one of the most common gaps. The electrician opens three walls to run new wiring. Who repairs the drywall? Who paints it? Is it the whole wall, or just the patch? Many homeowners discover too late that “electrical work” ended when the wires were connected.

Materials versus labor. Does the price include the tile, the vanity, the light fixtures and the faucet, or only the labor to install them? If some materials are included, at what quality level? (That last question leads straight to allowances, which deserve their own conversation.)

Appliances and owner-supplied items. If you’re buying the appliances, who receives them, inspects them, moves them into place and hooks them up? Who is responsible if one arrives damaged?

Moving and storing your belongings. Somebody has to empty the room and put things back. Is that you, the crew, or a mover?

Hidden conditions. What happens if the floor comes up and the subfloor is rotted, or the wall opens and the wiring isn’t safe? A clear contract explains how unforeseen conditions are handled and priced. It can’t list every possible surprise, but it should tell you what happens when one shows up.

Utilities and site access. On larger projects, temporary power, portable toilets, parking and material storage can all come into play.

Look for the exclusions

A well-written bid includes a list of exclusions: what the price specifically does not cover. Some homeowners see a long exclusions list as a warning sign. It’s often the opposite. A contractor who tells you plainly what isn’t included is a contractor who isn’t planning to surprise you.

The bid to be cautious about is the one with no exclusions at all, because everything not mentioned is still undecided.

How to compare two bids fairly

Lay the bids side by side and go line by line through the items above. Mark each one: included, excluded, or not mentioned. “Not mentioned” is the one to ask about.

Once you’ve filled in the gaps, the bids often get much closer together. Sometimes the lower bid turns out to be the higher one once you add back what it left out. Sometimes the higher bid simply includes more finished work. Either way, you’re now comparing the same project.

Ask out loud, and get it in writing

The single most useful question you can ask any contractor is: “What exactly is included in your price, and what isn’t?”

Ask it in conversation, then ask for the answer in the written contract. Verbal understandings are easy to remember differently six weeks later, especially when a wall is open and a decision is due. A good contractor will be glad you asked, because a clear scope protects them as much as it protects you.

Want more questions like this?

This is the first of ten questions on my free remodeling checklist, a one-page list of the conversations to have before you sign anything.

New here? Get the free checklist:

Already have it? Before You Remodel goes further: the full planning guide, homeowner questionnaire and 48-page project log.