For new construction buyers

Your new house passed inspection. That doesn’t mean it was built right.

Michael Stoler, retired builder

I’m Mike Stoler, a retired third-generation builder with 30 years in custom homes. This is what I’d check before you sign, and how I’d get the builder to fix it.

Get the Guide – $47

Instant PDF download · 30-day money-back guarantee

The town inspector checks safety: smoke detectors, outlets, handrails. Nobody checks the workmanship. That part is up to you.

Both of these will most likely pass code once they’re filled with caulk

3/16 inch gap between door trim and jamb
A 3/16″ gap between the door trim and the jamb. Totally unacceptable.
Baseboard that stops short at the curb and wall
Baseboard stops short at the curb and the wall.

The guide shows you how to spot work like this, and how to get it redone before you close.

What you get

  • A room-by-room field checklist to carry through your final walkthrough
  • What to catch at your 11-month warranty review, before the warranty runs out
  • Ready-to-send emails that get your builder to schedule the repairs
  • Real photos of bad trim and tile, so you know it when you see it
  • The 1/16-inch caulk rule, plus what to check before the drywall goes up
Sample pages from the guide Get the Guide – $47
30-day money-back guaranteeIf the guide isn’t right for you, email me within 30 days for a full refund.